Wednesday, November 16, 2011

Laundry room floor is done!

Today the grout was installed in the hallway to the laundry room and the laundry room itself!  I helped George with the cleanup part of it... the part where you have to wipe down each tile with water and then dry it with a towel to get the sandy film off of it.



When I took this picture, the grout was still wet, so it's darker than how it will likely dry.  Ironically, we want the dry grout color to be more like the dark shade it is when it's wet.  Oh well.  It's done now so we aren't changing it!!

It should be ready for having everything permanently installed tomorrow, provided George gets out of his other job early enough.  Otherwise, it'll be done on Friday.  At minimum, the floor needs one more wipe down to get the last bit of grit, and I'll do that tomorrow evening after work.

It looks really awesome!!!!

No comments: